Bidder Inquiries

Caltrans Bidding Connect Account:

Sign In (Sign in is required to access Project Plans)

Create Account (Click here to create a Caltrans Bidding Connect Account)


Viewing inquiries for 08-1J3104

Submit new inquiry for this project


Inquiry #1: Will Caltrans approve a CMS on the AFAL that is a NEMA 3R rated cabinet?
Inquiry submitted 06/23/2025

Response #1:Please bid per current contract documents.
Response posted 06/26/2025




Inquiry #2: Bid items 54, 55, & 56 call out for Cured-In-Place Pipeliner whoever we do see a specification for this work within the specifications. Can you please direct us to the specification?
Inquiry submitted 06/26/2025

Response #1:This issue will be addressed in an upcoming addendum.
Response posted 07/01/2025




Inquiry #3: The plans call for cured-in-place pipeliner for some of the existing culverts. The special provisions provided only contain specifications for Annular Space Grouting (71-3.01A(3)(e)). Please confirm which rehabilitation method of the culverts is desired and provide the corresponding specification section.
Inquiry submitted 06/27/2025

Response #1:This issue will be addressed in an upcoming addendum.
Response posted 07/01/2025




Inquiry #4: 0028 210280 ROLLED EROSION CONTROL PRODUCT (BLANKET) SQFT 86,000
What specific material is required?
Bio Coconut? Bio straw? or Bio Coco?
Could you also refer me to The Caltrans specs for this.

Inquiry submitted 06/30/2025

Response #1:Rolled Erosion Control Product Blanket (Type B) Double Net with 100% Woven Coir (Coconut) fiber core

Rolled Erosion Control Product (Blanket)(Type B) is a composite blanket consisting of a core composed of coconut, sandwiched between two non-synthetic nets for shear strength.

Spec 21-2.020(4) Erosion Control Blankets


Response posted 07/01/2025




Inquiry #5: There are no “L” dimensions provided for the headwalls. Please confirm the width of the headwalls will be the minimum 1.5 x H, from the center of the pipe to each edge of the headwall per the typical elevation on Std Plan D89B.
Inquiry submitted 06/30/2025

Response #1:Yes. Build per Std Plan D89B.

Response posted 07/01/2025




Inquiry #6: 1. What type of pipe is the existing pipe to be removed for DS 23-24?
Inquiry submitted 06/30/2025

Response #1:It’s an 18-inch CSP.
Response posted 07/01/2025




Inquiry #7: The drainage profiles show the headwalls with keyways in the footings, but the Std Plans do not show keyways. Please clarify.
Inquiry submitted 06/30/2025

Response #1:Build per Std Plan D89B (no key).
Response posted 07/01/2025




Inquiry #8: The plans call for cured-in-place pipeliner for some of the existing culverts. The special provisions provided only contain specifications for Annular Space Grouting (71-3.01A(3)(e)). Please confirm which rehabilitation method of the culverts is desired and provide the corresponding specification section.
Inquiry submitted 07/01/2025

Response #1:This issue will be addressed in an upcoming addendum.
Response posted 07/01/2025


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.